Call for Free Estimate 226.339.1105

Post-Construction Cleaning

Need expert post-construction cleaning services? We’ve got you covered! Our specialized team excels in providing thorough cleaning solutions for newly constructed or renovated spaces. We understand the importance of removing construction debris and dust to make your space move-in ready. With precision and attention to detail, we tackle everything from sweeping and scrubbing to polishing, ensuring your property shines from floor to ceiling. Our use of advanced techniques and high-quality products guarantees a spotless environment, allowing you to unveil your project with pride. The process is generally divided into three phases: Rough Clean, Light Clean, and Final Clean. Here’s a comprehensive checklist to guide you through each phase:

Phase 1: Rough Clean

This phase occurs after construction has ended and major installations are in place but before the final touches are added.

  • Remove Large Debris: Collect and dispose of all large trash, scraps, and debris left by construction crews.
  • Sweep and Vacuum: Remove dust and smaller debris from floors, vents, and other surfaces.
  • Sticker Removal: Remove stickers and labels from windows, appliances, and fixtures.
  • Basic Bathroom Clean: Remove any construction debris from sinks, bathtubs, showers, and toilets.

Phase 2: Light Clean

This phase is more detailed and involves cleaning areas that received their final installations, such as flooring and fixtures.

  • Detailed Dusting: Dust all surfaces thoroughly, including ceiling fans, light fixtures, and cabinetry.
  • Window Cleaning: Clean the interior and exterior of windows, including frames and tracks.
  • Floor Cleaning: Sweep and vacuum all flooring, preparing for mopping or specialized cleaning depending on the floor type.
  • Tile and Grout Cleaning: Clean all tiles, paying special attention to grout lines.
  • Cabinet and Drawer Cleaning: Clean inside and out of all cabinets, drawers, and closets.
  • Door and Frame Cleaning: Wipe down all doors, frames, and thresholds.
  • Wall Cleaning: Gently remove dust and smudges from walls. Be cautious with freshly painted surfaces.
  • Appliance Cleaning: Clean all appliances inside and out, removing any protective film.
  • Fixture Cleaning: Clean and polish all plumbing fixtures and fittings.
  • Countertop Cleaning: Clean and disinfect all countertops and surfaces.

Phase 3: Final Clean

The final phase ensures the property is move-in ready and focuses on polishing and deep cleaning.

  • Thorough Vacuuming: Vacuum all carpets and edges extensively.
  • Floor Cleaning: Mop or treat floors with appropriate cleaners for the material (wood, tile, laminate, etc.).
  • Touch-Up Cleaning: Revisit all previously cleaned areas for dust and smudges that have settled or been overlooked.
  • Bathroom Sanitization: Deep clean and sanitize all bathroom surfaces, fixtures, and toilets.
  • Kitchen Sanitization: Focus on sanitizing sinks, countertops, and appliance surfaces.
  • Mirror and Glass Cleaning: Clean all mirrors, glass, and reflective surfaces until streak-free.
  • Final Inspection: Conduct a detailed walkthrough to ensure no area has been missed and that all cleaning meets high standards.

Post-Construction Cleaning

Post-construction cleaning requires significant attention to detail. It’s not just about making a site look clean but ensuring it is thoroughly cleared of construction residue for the health and safety of future occupants. Depending on the size and scope of the project, consider breaking down the checklist further into room-specific or area-specific tasks for better efficiency.